Recent Comments

Archives

Archives

Bloworth Crossing

Eric Johnson advised: “The locomotive is an “P” class North Eastern Railway engine. built at Gateshead. the tender has L.N.E.R. painted on, so photograph is after 1923. Bloworth crossing is near Ingleby Incline (Battersby to Rosedale mineral line).” Bloworth Crossing is a familiar name to all those who have trod the Lyke Wyke Walk  or undertaken the Cleveland Way. It mark a crossing point for the original mineral railway by several ancient routes.

Image courtesy of Cleveland Ironstone Mining Museum, thanks to Eric Johnson for the update.

Sandsend, Lythe Bank and Railway Viaduct

This is a lovely image, sadly of an age long past.  A BR Standard class 4 2-6-4T leads a commuter train (with that weird brake van) into Sandsend station across the viaduct.

Image courtesy of Jean Carass.

Sandsend Station Viaduct

Another picture of the viaduct adjacent to the station at Sandsend, viewed from the hill above the village on the Whitby side. In the present day the former railway line is an excellent footpath and part of the Cleveland Way.

East Row Viaduct, Sandsend

scn_002-a-1

Sandsend Viaduct, with local train – was how we originally posted this image. But alas we got it wrong!  – it is a view of East Row Viaduct in the 1956 with a local commuter train from Whitby approaching. Sadly this picturesque line, which skirted the coast all the way from Saltburn to Whitby and from Whitby to Scarborough, has vanished, leaving only the mineral railway from Saltburn to Boulby Potash Mine. The locomotive leading this mixed passenger/goods train is an ex-Great Central Railways Robinson A5 4-6-2 Pacific tank; well at home on this demanding coastal line. The quaint seaside shop shown in the bottom right hand corner of the image still exists, doing an excellent trade of refreshments and beach essentials, weather permitting! Mark advised us: “Sorry to be picky, but this is East Row viaduct (Sandsend viaduct being the one adjacent to the station). Having said that, goods for Sandsend were handled at East Row, the Goods Shed (just visible in the background) remained in place until the early 1990s. Parts of the viaduct’s pier foundations can still be seen on the beach.” Meanwhile the goods shed site mentioned by Mark in the background are currently being developed as an upmarket housing development by the Mulgrave Estates.

Image from the Neville Stead Collection, many thanks to Mark for pointing out our mistake!

Double Bridges – Claphow Lane

Yes I know we have a photograph of this bridge, but not like this. Look at all those bricks; how long to draw all those?
Image courtesy of Joan Webster.

Double Bridge Claphow

One of the two rail bridges at Claphow, Stanghow Road (the road connecting New Skelton directly to Lingdale). Due to mining subsidence the bridge was strengthen with the addition of a second arch inside the original arch. A buttress was added at the right hand side and four iron rods inserted through the parapet, whilst the left hand side was concreted.

Andrew Pearson tells us: ”Really good photograph, looks to be from around 1964 or maybe early 1965. The railway was part of the much missed coastal route down to Whitby and Scarborough from Middlesbrough which closed completely in May 1958 between Loftus and Whitby West Cliff, passenger trains continued to run to Loftus until 1960 and then only to Guisborough until 1964 when it too closed under what came to be known as the Beeching Axe, which was to devastate the UK rail network. By this time the only traffic across this bridge was the weekly goods (mostly coal), to Boosbeck public delivery siding, from the Brotton direction, which ended in September 1964 when the depot at Saltburn took over coal deliveries enabling this line to be closed altogether. The line from Guisborough meantime had been cut just before reaching Boosbeck and was used for the storage of redundant wagons for the last five years of its life. During the summer of 1965 all the rails and fittings were uplifted from Brotton junction to the Esk Valley line junction near Nunthorpe inclusive, and this bridge was subsequently removed during improvements to the Lingdale to Skelton road. The other bridge behind it in the picture, on the Priestcroft Junction to Skelton triangle line, is still there.”

Alastair MacKenzie adds: “I recall this too and think it was demolished in early 1970’s. Andrew is correct but doesn’t mention that the other leg of the triangle is still in use for the potash trains. This takes off at North Skelton and re-joins what would have been the triangle at Brotton. As a child living at Boosbeck, I recall seeing many iron-stone and passenger trains on this triangle. Often at night particularly if cold and frosty, the finished steel product trains to or from Skinningrove could be heard. The playing field behind our house at Wandhill, Boosbeck; looked onto the Boosbeck end of the triangle at Priestcroft. I never saw this personally but it is known that excursion trains from places like Leeds and Bradford, coming to Redcar and Saltburn, would run up to the triangle to be turned as the turntable at Saltburn was too small for loco’s like the V2. They would run up coupled in twos and threes to turn by reversing onto one or other leg.”

Andrew Pearson confirms this: “The other leg of the triangle is part of the Saltburn – Boulby line which is very much still with us and in regular use but singled throughout, where before it was double track from Saltburn Junction through Brotton to Carlin How and then single track on through to Whitby/Scarborough with passing places at Loftus, Staithes, Hinderwell, Kettleness, Whitby West Cliff then Robin Hood’s Bay, Ravenscar, Staintondale and Cloughton. Opened in 1872(goods) and 1875(passenger) as the ‘Saltburn Extension’ the line served ironstone mines at Longacres, Lumpsey and Brotton in their time as well as Skinningrove Works now also Boulby Potash (rebuilt 1974 from Carlin How with a new viaduct) and it occasionally even sees steam hauled specials the most recent of which ran as far as Carlin How and back on March 30 2013. Intermediate stations were North Skelton and Brotton. Passenger services between Saltburn and Brotton ended September 6 1957 and between Loftus/Brotton/Guisborough April 30 1960 but goods services continued thereafter as in my previous post as well as mineral workings Lingdale Pit until 1962, Kilton (1963) and North Skelton (1964).
The triangle was indeed used also for turning excursions particularly Redcar races specials, sometimes the whole train might have to go up to turn if siding space for the stock was not available on the day; I remember seeing empty passenger coaches crossing Saltburn bridge to do just that in the very early 60s when there was no longer a normal passenger service, not long before all that sort of traffic started to be discouraged by British Rail under Beeching, and far too many useful lines started to close down.”

Callum Duff asked: “I’m convinced that this bridge existed until around 1975 because I remember my Dad driving under it when I was a child and me being intrigued by such an unusual structure. Does anyone else know for sure when it was actually demolished?” Andrew responded with: “Not too sure as to the exact date but 1975 would be about right as it was definitely missing by 1976 when I happened to pass that way. As can be seen in the picture, the road was very much still a country lane and not suited to the ever increasing traffic even back in the 70s, never mind now when speeds are dangerously high so improvements were a priority on safety grounds. The bridge had been in a poor condition for a long time due to mining subsidence, it presented a bottleneck and once its rail function ended it would have had little further purpose.”

Image courtesy of Ted Morgan (via Eric Johnson), with information from Eric Johnson; also thanks to Andrew Pearson, Callum Duff and Alastair MacKenzie for the updates.

Saltburn Viaduct

Saltburn viaduct and a steam train with a rake wagons filled with  ironstone passing over. The viaduct today carries trains from Boulby Potash mine and service as necessary the works at Skinningrove.

Image courtesy of Eric Johnson.

Twizziegill Culvert

When first posted, the Archive was aware it was a culvert being dug out; however David Richardson came to the rescue with: “Yes it is Twizziegill Culvert during its construction.” As the Teesside to Whitby via the coast line opened in December 1883, creation of the culvert must have been prior to this date. Visible are a lot of workmen, but not doing any work; obviously the photographer was expected.

Image courtesy of Cleveland Ironstone Mining Museum and thanks to David Richardson for the confirmation.

Kilton Viaduct and Stream (1860)

You can see from this much earlier image how light and open the valley was originally.  I wonder if the viaduct had been built with arched spans whether the problem would still have manifested itself.  I’d need an engineer to tell me – is there an engineer in the house? Simon Chapman advises: ”Kilton Viaduct opened for traffic in 1867 and was later filled in with shale to create a massive embankment so that mining could take place beneath it. During this work which took years, one of the pillars showed signs of stress possibly because of uneven tipping, so traffic over was stopped for a fortnight until the problem was remedied. So if the viaduct had been built with arches it would still have ended up as we see it today.”

Image courtesy of the Pem Holliday Collection and others, thanks to Simon Chapman for the update.

Carlin How and Loftus Viaduct in 1866

A beautiful valley and an elegant structure, before the viaduct became unstable and was filled in with waste from the mine to create an embankment.