The proud loco men pose for their photographs with their brand new locomotive.  The NER insignia being for the North Eastern Railway which became one of the component companies of the London and North Eastern Railway. This is a late Victorian image – I wonder if this is one of the locomotives that used to operate on the Skinningrove ”Z”?

Geoffrey Allen tells us: ”The loco is a class 1037 0-6-0T built at Darlington Works in 1876 one of a class of four specially built in 1876 for the Skinningrove Zig Zag. As pictured it is not new, but as rebuilt in the early 1890′s. The last of the class to work on the Zig Zag was No.1294 withdrawn from Carlin How shed in 1910. This class replaced the 1866 built Class 1196 0-6-0ST’s on the Zig Zag which at 6 tons heavier caused track damage. These were subsequently rebuilt from 1876 as 0-6-0 Tender engines and as rebuilt lasted until 1910.”

Many thanks to Geoffrey Allen for that update.

Construction at Skinningrove Iron and Steel Works

Based on a possible recognition of ”the buckets” in this image, it was wondered if this was the construction of the new road into the site; it was adjacent to the aerial rope-way and the stanchions remained as a lighting column after completion of the road. Now known to be the work undertaken by Wimpeys in August 1949.

Image and confirmatory information courtesy of the Pem Holliday Collection.

No. 5 Blast Furnace Construction

The Archive believed this was the building of No. 5 blast furnace and since confirmed by Eric Johnson; it looks strange without it’s clothes on!  Arthur Ormrod tells us: ”The tall cylinders then would be the ”Cowper stoves, in which cleaned blast furnace gas is burned and used to heat the incoming cold blast, which then leaves as hot blast. These regenerative heat exchangers were invented by Edward Cowper in 1857 and are still used in blast furnace plants today.” Half-way along this bank of units was a long pipe  ending in a thin rubber pipe and daily a sampling of the blast-furnace gas to test it for calorific value (among other things) was undertaken.

Many thanks to Eric Johnson and Arthur Ormerod for the updates.

Staithes

An artists dream picture; Staithes on the right and Cowbar on the left with the foot bridge in the foreground with a man and his horse crossing. This view of the footbridge across the beck with Cowbar Nab in the back ground, must have been replicated many times. The hand tinting shows to good effect particularly in the roofs of the cottages, this image is from the Phoenix postcard series by Brittain & Wright of Stockton.

Staithes

Many people have taken this shot – but only one person has mastered it – Frank Meadow Sutcliffe. This image is from “Photographic View Album of Whitby” – photographed and printed by Valentine & Sons Ltd., Dundee and later used in many of their postcards.

Top of the Bank

The shop and house in 1984.  It changed hands again, once or twice, over the years and the shop has now gone; there’s a garden in its place.

Image courtesy of John Roberts.

Steam Crane Erecting Steelwork

Another unidentified image and this time from much earlier.  It appears to be the construction phase of an industrial plant, possibly a steel plant. A beautiful steam crane is being used. Help would be appreciated in trying to identify the period and hopefully the location.

There She Blows!

This is a classic shot! It evokes all the memories of what used to make Britain Great.  People who worked in Steel for years and looking at this image can still recall the thrill of tapping time on the furnaces at Skinningrove – once you’ve got Steel in your blood it never leaves you! They can feel the heat from the metal in front of the worker on the right and can still remember how cold their back used to feel, when standing and watching the casting process as a furnace was tapped. Eric Johnson tells us: “The ‘mud gun’ (used to stop the flow of iron when tapping was finished) can be seen on the left; lit by the light from the molten iron.”  Above that and running like a band across the image is the ”bustle” which carried the heated air to feed the furnace.  The flag-like objects sticking up in the image were stoppers to stop (or allow) the flow of metal along the runners and into the pots.  One of them will be a skimmer used to divert any slag running on top of the iron into a slag pot.  This was no place for a stranger to the business – hot, gassy and easy to get in the wrong place! Arthur Ormrod advises us: ”A correction to the comments if I may.  The bustle carried the hot blast, preheated air, which was fed into the furnace through the tuyeres, the blast of the blast furnace.   Blast furnace gas, carbon monoxide, is collected from the top of the furnace, cleaned, and then used as a fuel in the works, including being burned to heat the hot blast.”

Many thanks to Eric Johnson and Arthur Ormerod for those updates.

Bessemer Plant, Cleveland Works

This is an image of the Bessemer plant at the Cleveland Works; they were in pairs and one was always producing basic iron and the other ferro-manganese (which was used for alloying the steel at Skinningrove).

Rob Proctor informs us ”The word “Bessemer” could cause some confusion to the uninitiated reader , as it is a steelmaking process whereby air is blown through the liquid iron .The blast of air oxidised the impurities which as they burnt off conveniently raised the temperature of the metal so that the finished steel could be poured out . The vessel resembled a “tulip” sat on a pair of trunnions which could be tilted to the horizontal for the addition of hot metal and then turned into the vertical for the blow. The reason for name “Bessemer” for a blast furnace plant was because either one or two of these units had been sited there in the past”.

Andrew Mains advises: ”I worked on these two furnaces in the 80’s and early 90’s before they were shut down. There were two furnaces going together, but this changed when demand dropped, so it went down to one furnace operation. They were named no 4 and no 5 furnaces and the plant name was changed to Cleveland Iron.”

Arthur Ormrod tells us: ”The survival of the Bessemer blast furnaces was down to their, relatively, small size and their consequent suitability for smelting manganese and ferromanganese. Manganese was a metal of strategic importance, it was vital in both making steel and in hardening steel, armour-plate for example.  Consequently, there was a government supported cartel to secure it’s manufacture within the U.K.  Dorman Long was one of, originally five, later four, iron making companies which kept a small blast furnace available for the smelting of ferromanganese.  It required higher temperatures than iron smelting and consequently the wear on the furnace was greater.  One by one the other plants closed down, Darwin & Mostyn first, then Lancashire Steel and Workington, both by the BSC, leaving the Bessemer blast furnaces as the sole source of manganese smelting in the UK and that is why this relatively elderly plant survived into the 1990′s. Today, manganese is smelted in electric furnaces.”

Many thanks to Rob Proctor, Andrew Mains and Arthur Ormerod for those updates.

Dorman Long Furnaces at Redcar

We believed these were the Clay Lane furnaces at South Bank! However we have been advised by Arthur Ormrod: ”These are not the South Bank furnaces, these are the two Redcar furnaces of Dorman Long, rebuilt in 1953.  The hi line bunkers to the left, under which the scale cars operated, are of the traditional rail served type on which hopper wagons discharged the raw materials into the bunkers.  The structure top left is a vertical wagon hoist, used to raise wagons up to the hi line.  The raised brick structure straddling the lattice-work skip hoist, right centre, housed the skip hoist motors which raised the raw material skips to the furnace charging platform. The Clay Lane bunkers were roofed over and were serviced by conveyor belts and trippers.  The lattice-work skip gantries on the Clay Lane furnaces were at a steeper angle than those shown here and the hoisting mechanisms on these furnaces were housed in an extension of the cast house, directly under the skip hoist.”